Defect with bridge joints, Lane 1 westbound CW

Reported via desktop in the Pothole (NH) category anonymously at 13:56, Mon 15 March 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2609884.

In nearside wheel path.

Street view: https://www.google.com/ maps/ @50.8679112,-0.157764,3a,82.4y,244.61h,81.22t/ data=!3m6!1e1!3m4!1scpCVxSG15xdu7_mkOzqzTQ!2e0!7i16384!8i8192

Defect may not be deemed hazardous yet, but the cracking/ hole is likely to worsen.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which has been passed to our inspector for review during his weekly safety inspection along this stretch of the A27 when it will be recorded and appropriate mitigation planned.

    Safety defects are attended to and made safe within 24 hours and any permanent repairs that are required are then carried out within 28 days. Service defects are less severe and are further categorised into high or low priority. Service high defects will aim to be repaired within 6 months, whereas service low defects are monitored and placed into future programme of works and bid for funding.

    If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000

    • info@highwaysengland.co.uk

    Kind regards Highways England

    State changed to: Fixed

    Posted by Highways England at 09:10, Tue 16 March 2021

This report is now closed to updates from the public. You can make a new report in the same location.