You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Really dangerous bump in the road surface

Reported via desktop in the Road surface (NH) category anonymously at 12:13, Sun 14 March 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2607313.

Causing swerving of oncoming traffic in to the opposing lane... The Road has collapsed where it goes over a tunnel beneath. Lorries are swerving to miss the bump and coming head on to avoid!!! THIS REALLY MUST BE FIXED, just by placing a 'bump in road' sign does nothing!

ALSO Highways England should have an easy to find link on the website to get to this page!!!!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report about the condition of the A27 carriageway. Our inspector will review the location during his next inspection when any defects will be recorded and mitigated as appropriate.

    Safety defects are attended to and made safe within 24 hours and any permanent repairs that are required are then carried out within 28 days. Service defects are less severe and are further categorised into high or low priority. Service high defects will aim to be repaired within 6 months, whereas service low defects are monitored and placed into future programme of works and bid for funding.

    If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000

    • info@highwaysengland.co.uk

    Kind regards Highways England

    State changed to: Fixed

    Posted by Highways England at 10:01, Mon 15 March 2021

This report is now closed to updates from the public. You can make a new report in the same location.