You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Dangerous road surface!!!

Reported via desktop in the Road surface (NH) category anonymously at 12:09, Sun 14 March 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2607304.

5 years NOW!! AND NOTHING!!!! this has been badly patched once and is causing cars to swerve at the junction to avoid the potholes and road surface breakup. This is already a dangerous junction made worse by the lack of road repair. OVER 5 YEARS!!! I will be claiming for tyre damage as well alignment. Repair this NOW FFS!!!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting Highways England. concerning the condition of the A27 carriageway. We shall look into this issue during our next safer inspection, when suitable mitigation will be arranged.

    Safety defects are attended to and made safe within 24 hours and any permanent repairs that are required are then carried out within 28 days. Service defects are less severe and are further categorised into high or low priority. Service high defects will aim to be repaired within 6 months, whereas service low defects are monitored and placed into future programme of works and bid for funding.

    Kind regards

    Highways England

    State changed to: Fixed

    Posted by Highways England at 08:33, Mon 15 March 2021

This report is now closed to updates from the public. You can make a new report in the same location.