Closed
Bridge joints
Reported via mobile in the Structures (eg bridges, fencing, noise barriers) (NH) category anonymously at 17:39, Mon 22 February 2021
Sent to National Highways less than a minute later. FixMyStreet ref: 2564914.
Bridge joints installed incorrectly, uneven joints. Water sat on top of tarmac indicates drainage not installed in joints.
Updates
-
Working as an operative for the company installing the joints on brockworth bypass last summer. The concrete repairs that needed to be undertaken to the damaged bridge deck, incorrect material was used to do these repairs meaning deck failure will happen again
Posted anonymously at 17:45, Mon 22 February 2021
-
Thank you for contacting Highways England. concerning bridge joints.
We shall look into this issue and aim to provide a response by 08/03/21.
Can we please ask that you check back on this date for an update.
Kind regards
Highways England
Posted by National Highways at 19:21, Tue 23 February 2021
-
Thank you for your patience whilst our inspector and structures team reviewed your your report.
Everything looked to be OK.
We will continue to review this and will arrange any required work if the situation changes.
If you require any further update on this issue our Customer Contact Centre is available 24 hours a day at: • 0300 123 5000
• info@highwaysengland.co.uk
Please quote 21856562 to discuss this matter further.
Kind regards Highways England
Posted by National Highways at 10:49, Fri 5 March 2021
-
State changed to: No further action
Updated by National Highways at 10:49, Fri 5 March 2021
This report is now closed to updates from the public. You can make a new report in the same location.