You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

M1 jct 35-33 60 zone

Reported via mobile in the Sign issue (NH) category anonymously at 20:12, Thu 4 February 2021

Sent to National Highways less than a minute later. FixMyStreet ref: 2525640.

60 zone heading southbound is only showing 60 on 1 gantry, similar story going North with no indication of when NSL starts again.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This is a technical fault effecting the two gantries. An engineer will attend to rectify the issue. Speed limits for air quality have now been suspended. With greatly reduced vehicle emissions on our motorways as a result of reduced traffic flows and the latest national lockdown Highways England has decided to temporarily remove the air quality speed limit trials. There remains a commitment to delivering cleaner air and the air quality speed limit trials will be reintroduced once traffic flows return to near pre-Covid-19 levels

    Posted anonymously at 10:57, Fri 5 February 2021

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?