Vertical ridge or step in the road profile

Reported via desktop in the Road surface (NH) category anonymously at 21:44, Tuesday 3 November 2026

Sent to National Highways less than a minute later. FixMyStreet ref: 10326027.

Location - M23 Merstham Interchange (J8) mainline overpass viaduct at the northern expansion joint. The issue is present in both the southbound and northbound carriageways.

Description - the land based carriageway sits lower than the viaduct carriageway, creating a vertical ridge or upwards step in the road profile for southbound users and a vertical drop for northbound users. The estimated height difference between the two carriageway sections is roughly 30 mm, and appears to be greatest in the southbound carriageway.

Safety risk - A height difference of this scale presents as unsafe for typical motorway speeds, including lower variable speed limits (VSLs). As of early November 2026, the safety risk is likely highest in the southbound carriageway where vehicles are forced upwards and the height difference seems to be greatest. The defect appears to be capable of causing vehicle damage or destabilisation.

Requested action - repair works to restore a flat road surface profile at the transition joint that safely accommodates high speed traffic.

Provide an update

Please note that updates are not sent to National Highways. Your information will only be used in line with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a National Highways Report a problem password?